Photos of this page

When your site is properly prepared, our experienced equipment installation team will arrive on site. Your equipment will be assembled and then installed in place.

There are two types of equipment installation

  • In ground installation involves placing the base legs of the unit of equipment into a hole in the ground and setting this in concrete.
  • Bolt Down installation can be used where there is an existing concrete base onsite and the equipment can be bolted down onto this.

All equipment will be installed to meet EN 1176 – European equipment safety standard requirements.

Did you know?

‘The child’s toys and the old man’s reasons, are the fruits of the two seasons’. - William Blake. 1863. Auguries of Innocence

Corofin, Tuam,
Co. Galway
tel. 093 411 00

Killanne, Rathnure,
Enniscorthy,
Co. Wexford
tel. 1890 467 529

Go Play Limited
Company Reg. No. 347587